We visited the Tuff Shed in Phoenix to finalize our order and delivery date.We met with Javier Contreras at Tuff Shed.Cesar Rodriguez put down ABC Aggregate Base Course to provide a foundation for our Tuff Shed.He used a Bobcat to transfer it from the street to the site for the shed in the backyard. The Bobcat helped to pack down the ABC after he spread it out.The shed is 10X10 so we made the ABC foundation at 11X11. Packing down the ABC.You can see the stakes I put in.ABC Aggregate Base Course is packed down and ready for the shed.These are our Tuff Shed materials on the trailer.The lumber is labeled with our name throughout.The Tuff Shed starts with a steel foundation. I was able to choose what angle and direction it would face.Desert Breeze Remodeling, LLC installed our shed.One wall was put up at a time.The outside already came primed. I had to prime the inside.A green metal roof was installed.A metal roof will last a long time.There were two workers that built out Tuff Shed.Tuff Shed is ready to be painted.We rolled and brushed the entire shed inside and out. It took 3-4 days. If I had to do it over I probably would have sprayed it.The shed was painted the same color as our cabin with the door and trim in dark green.The inside was bare wood. It had to be primed, then painted. We decided to paint the floor also grey. There were a lot of nooks and crannies inside, making the painting inside difficult and time-consuming.Some of our supplies. 10X10 provides plenty of room.The finished shed from the left.The finished shed from the right.Finished Tuff Shed.